About this document
Vertical AHU Installation Guide by Ayyappan Veeraputhiran is a document available to read on EtoBox.
The key steps for installing an air handling unit (AHU) include properly supporting and lifting the unit, locating it in the designated room while ensuring proper clearances, preparing it for installation by removing protective coverings and brackets, and assembling any sections that were not factory assembled. It is also important to properly align the fan and motor drives, adjust any drive belts, correctly install any steam or water coils, and perform startup and checkout procedures to test for leaks or p
- Author
- Ayyappan Veeraputhiran
- Language
- EN