Opening book details…
Can I read Material Cost Breakdown for Transitional Shelter on EtoBox?
Material Cost Breakdown for Transitional Shelter by musahujoom is a document available to read on EtoBox.
What is Material Cost Breakdown for Transitional Shelter about?
This document provides a cost estimate for materials and labor to construct a transitional shelter in Herat, Afghanistan. It lists the materials needed, quantity, unit cost, and total cost for both the main shelter and bathroom. The total estimated materials cost is 51,380 AFN for the shelter and 5,530 AFN for the bathroom. Additional costs include 167.57 USD for unskilled and skilled labor. In total, the estimated cost to construct the transitional shelter and bathroom is approximately 12,400 AFN or 167.57
- Author
- musahujoom
- Language
- EN