Skip to content

Opening book details…

About this document

Ashford Bobbin Mill Hydropower Study by Sam Townsend is a document available to read on EtoBox.

This document analyzes the feasibility of a hydropower project at the Ashford Bobbin Mill site on the River Wye in Derbyshire. It examines the site characteristics, water flow measurements from an Environment Agency gauge and hydraulic modeling software, grid connection options, potential power outputs from different turbine options, estimated revenue, and next steps. The analysis concludes the site shows potential for hydropower generation and recommends further investigating options for installing turbine

Author
Sam Townsend
Language
EN