Naguillan Water Supply Project Estimate by Fritz Natividad is a document available to read on EtoBox.
The document provides a detailed estimate for the Naguillan Water Supply Project located in Barangay Baraoas. It includes estimates for pipeline laying works totaling 23,000 meters at a unit cost of 59.11 pesos, gate valves with a total cost of 122,082.98 pesos, and an interconnection set with a total cost of 8,330 pesos. The estimates break down costs for materials, equipment, labor, overhead, profit, and taxes for each item.