33/11KV 10MVA Transformer Installation Guide by Sundaresan Sabanayagam is a document available to read on EtoBox.

The document provides a schedule for the supply and installation of power equipment at an ECIL 33KV substation, including: 1) A 10MVA, 33/11kV power transformer along with associated accessories and fittings. 2) A control and relay panel for power transformers rated at 10MVA and 15-20MVA. 3) Current transformers and lightning arrestors for the 33kV system. 4) Associated cabling work and civil works for installation.