About this document
Proslide 32sr PM Checklist-1 by Railean Vitalie is a document available to read on EtoBox.
The document outlines a comprehensive preventive maintenance checklist for equipment, covering basic information, electrical safety, battery and charging, mechanical inspection, mobility, collimator, generator performance, tube condition, control panel, exposure control, DR system, cleaning, safety, functional tests, and final status. Each section includes specific checks to ensure the equipment operates safely and effectively. The checklist is designed to identify any issues and confirm that the system is
- Author
- Railean Vitalie
- Language
- EN