About this document
Rainwater and Sewage Drainage Calculations by Pradeep Sukumaran is a document available to read on EtoBox.
The document outlines drainage calculations for a facility with 348 guests and 100 staff. It determines: 1) The total daily sewage is 113.4 m3 and the main pipe size is 160mm diameter. 2) A holding tank of size 27.7m x 3m x 3m deep is required to store 2 days of sewage production of 158.4 m3. 3) Sewage and storm water lifting stations are needed in the basement to pump sewage at 2.5 lps and storm water at 1 lps. 4) Rainwater drainage estimates a maximum flow of 22.9 lps through 11 outlets to drain 11
- Author
- Pradeep Sukumaran
- Language
- EN