About this document
Batu Caves Track Layout Drawing by Mazlan Sayudin is a document available to read on EtoBox.
The document is an as-built drawing for the Batu Caves Electric Double Track Project, detailing the track layout between Sentul and Batu Caves. It includes information about the project owners, operators, and consulting engineers involved, as well as a copyright notice. The drawing emphasizes the importance of verifying measurements on-site and coordinating with other consultants
- Author
- Mazlan Sayudin
- Language
- EN