Skip to content

Opening book details…

Can I read Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 on EtoBox?

Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 by nccbagodaralimdi is a document available to read on EtoBox.

What is Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 about?

The document outlines the commencement of Full Depth Reclamation (FDR) work on NH-47 in Gujarat, revealing unsuitable subgrade soil with high plasticity and moisture issues. A joint site inspection confirmed the need to replace this subgrade material to ensure pavement stability and performance. Payment for this replacement will be handled separately, and a Dense Bituminous Macadam layer will be added to enhance structural strength.

Author
nccbagodaralimdi
Language
EN

More by nccbagodaralimdi

Browse all works by nccbagodaralimdi