Opening book details…
Can I read Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 on EtoBox?
Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 by nccbagodaralimdi is a document available to read on EtoBox.
What is Removal and Replacement of Unsuitable Subgrade in FDR Portion 1 about?
The document outlines the commencement of Full Depth Reclamation (FDR) work on NH-47 in Gujarat, revealing unsuitable subgrade soil with high plasticity and moisture issues. A joint site inspection confirmed the need to replace this subgrade material to ensure pavement stability and performance. Payment for this replacement will be handled separately, and a Dense Bituminous Macadam layer will be added to enhance structural strength.
- Author
- nccbagodaralimdi
- Language
- EN