Skip to content

Opening book details…

About this document

The Aswan High Dam K by jotarokujo2001omgmybad is a document available to read on EtoBox.

The Aswan High Dam, located on the Nile River in Egypt, was constructed to control flooding and provide hydroelectric power, costing over $1 billion and completed in 1970. It has significantly increased agricultural production by allowing year-round farming, but has also led to negative effects such as soil salinity and reliance on chemical fertilizers. The dam currently produces about 15% of Egypt

Author
jotarokujo2001omgmybad
Language
EN