Skip to content

Opening book details…

Can I read Inspection Report: 250 MVA Transformer Seepage on EtoBox?

Inspection Report: 250 MVA Transformer Seepage by mirzarubab93 is a document available to read on EtoBox.

What is Inspection Report: 250 MVA Transformer Seepage about?

The TSG (South) team inspected a 250 MVA T-2 transformer at the 220 KV Grid Station Hala Road, identifying oil seepage issues attributed to deterioration of welding plates. Despite satisfactory pressure test results, the root cause of the seepage remains unclear, raising concerns about manufacturing quality. Recommendations include replacing the transformer with a defect-free unit and ensuring an extended warranty for fault resolution.

Author
mirzarubab93
Language
EN