About this document
Mock Drill: Power Cut Response Timings by Mohammad Pradicta is a document available to read on EtoBox.
A mock drill was conducted to test emergency preparedness for a power failure scenario. The scenario involved a power outage in the reactor area, stopping production. The supervisor called engineering to restore power, which took 9 minutes. Production resumed once power was restored and quality checks found no issues.
- Author
- Mohammad Pradicta
- Language
- EN