About this document
Marsh Excavation Methodology Overview by Adaghara is a document available to read on EtoBox.
This document outlines the excavation methodology for marsh ditches and small creeks along a 49 km pipeline right-of-way between two manifolds. It involves excavating 53 water crossings using various equipment like marsh backhoes, draglines, and spud barges. The basic excavation method involves using backhoes for the trench and draglines for wider creeks. Excavated material will be stored within the right-of-way. Safety measures like permits and a permit-to-work system must be followed when working near exi
- Author
- Adaghara
- Language
- EN