About this document
Road Rehabilitation Cost Estimates by Mustansar is a document available to read on EtoBox.
The document outlines the Sindh Flood Emergency Rehabilitation Programme for the Shikarpur district, detailing the rehabilitation of various roads with a total estimated cost of 380,063,331.00 PKR. It includes specific road lengths, widths, and a breakdown of costs associated with earthwork, sub-base, surface course, structures, drainage, ancillary works, and environmental measures. The document provides detailed engineer estimates and measurement sheets for each component of the rehabilitation project.
- Author
- Mustansar
- Language
- EN