About this document
ACoP 2014 Phase II Reinstatement Guidelines by eng.ahmadalrashdan is a document available to read on EtoBox.
The Ashghal Code of Practice (ACoP) 2014 outlines the reinstatement requirements for major and minor roads, detailing changes in minimum lengths for reinstatement wearing courses. The updated ACoP 2024 proposes relaxations, reducing the minimum lengths for major roads from 50M to 10M for three-lane roads and from 20M to 5M for two-lane and one-lane roads. Additionally, specifications for manhole and gully reinstatement are provided, indicating required modifications and cutting widths.
- Author
- eng.ahmadalrashdan
- Language
- EN