Metal Duct Submittal for New Capital Project by Mostafa Elsamman is a document available to read on EtoBox.

The document provides information on the inspection of fabricated galvanized steel duct that was delivered to a construction site. The inspection report notes that 364 kg of fabricated galvanized steel duct was received from the manufacturer CSCEC in Egypt on March 7, 2023 and stored at location DO1. The inspector found the material to be satisfactory for incorporation into the permanent works, pending the contractor