RAB Pekerjaan Elektrikal Gedung Cikarang by La Dody is a document available to read on EtoBox.
This document provides a cost estimate for electrical work for the construction of a Prima Group building branch in Cikarang. It includes the costs for various electrical panels including an LV main distribution panel, pump panel, lift panel, and floor panels. Panel components and their quantities are listed along with unit costs and total costs. Installation costs are also included for each panel. The total estimated cost for all electrical work is IDR 47,623,400.