Skip to content

Opening book details…

About this document

Geotechnical Investigation Report by Marco Dela Cruz is a document available to read on EtoBox.

This boring log summarizes geological information collected from a borehole drilled at the proposed Kaliwa Water Treatment Plant site in Teresa, Rizal, Philippines. Samples were collected from 0-35 meters depth using split spoon and core barrel sampling methods. The upper 3 meters consisted of silty clay and clayey silt soils. From 3-10.5 meters depth, highly to extremely weathered basalt bedrock was encountered in core samples, appearing fragmented with fractures and veins. The basalt was described as ligh

Author
Marco Dela Cruz
Language
EN