About this document
Culvert Slab by Sakina Lightwala is a document available to read on EtoBox.
The document outlines the estimate for the reconstruction of the top slab of a box culvert near Moti Dargah in Ode, detailing various construction tasks and their associated costs. The total estimated cost for the project is Rs. 486800.00, which includes labor, materials, and additional charges such as GST and contingencies. Each item includes specific quantities, rates, and descriptions based on the R&B Schedule of Rates for 2024-25.
- Author
- Sakina Lightwala
- Language
- EN