About this document
Slab Culvert Quantity Survey Guide by adarshprashant99 is a document available to read on EtoBox.
This document provides a quantity survey for a slab culvert with a 1.5m clear span and 4m roadway. It lists 6 items: 1) earth works excavation, 2) PCC foundation, 3) first class brick work, 4) brick work deductions, 5) cement pointing/plaster, and 6) string course. For each item, it specifies the description of works, quantities, units, and provides totals. The quantities are based on drawings showing plan and elevation views of the culvert.
- Author
- adarshprashant99
- Language
- EN