About this document
Construction Cost Estimate Breakdown by mukul bhaumik is a document available to read on EtoBox.
The document outlines a detailed bill of quantities for construction work on the second floor, including various tasks such as concrete mixing, brickwork, plastering, and installation of tiles and fixtures. It specifies quantities, unit rates, and total amounts for each type of work, culminating in a total cost of Rs. 928,813. The work includes both structural elements and finishing touches like painting and false ceilings.
- Author
- mukul bhaumik
- Language
- EN