About this document
Bid for Solar Power Plant Installation by adiworks0 is a document available to read on EtoBox.
This document outlines the bid details for the design, supply, installation, commissioning, and maintenance of a grid-connected rooftop solar power plant by Bharat Petroleum Corporation Ltd, with a bid end date of January 28, 2026. It specifies requirements such as a minimum average annual turnover of 19 lakhs, three years of relevant experience, and the need for EMD and performance security. The document also includes provisions for MSE purchase preference and outlines the technical specifications for the
- Author
- adiworks0
- Language
- EN