Can I read Biaya dan Instalasi Sistem Hydrant on EtoBox?
Biaya dan Instalasi Sistem Hydrant by vixer ndi is a document available to read on EtoBox.
What is Biaya dan Instalasi Sistem Hydrant about?
This document provides a proposal for firefighting work at the RS Hermina project site in Cibitung. It includes 7 items of work for the fire hydrant system installation in the pump room and 3 items of work for installing outdoor fire hydrants. The total estimated material and labor costs are IDR 238,614,483,000 and IDR 20,205,149,000 respectively.
- Author
- vixer ndi
- Language
- EN