220kV ATR Barbending Schedule for Faisalabad by noman zafar is a document available to read on EtoBox.
This document provides a bar bending schedule for a 500/220/132 KV substation in Faisalabad, Pakistan. It lists 7 items with details on the description, location, bar number, lengths, bends, cuts, spacing, number of bars, weightage, weight, and figure for each. The total weight for one foundation of the ATR pad is 3302 kg and there are 3 foundations for a total of 9906 kg. The total weight for one foundation of the fire wall pad is 2664 kg and there are 2 foundations for a total of 5328 kg. The dowel and di