Skip to content

Opening book details…

About this document

Cable-Stayed Bridge Case Study: Nymburk by Bravo Paytano Bryan is a document available to read on EtoBox.

The document describes the design and construction of a cable stayed bridge over the River Labe in Nymburk, Czech Republic. Key points: - The bridge features a 132m main span and two 41m approach spans supported by low pylons and two planes of cable stays in an extradosed configuration. - A 52m central section comprises steel box girders lifted into place that are connected to the concrete structure. - Finite element modeling and load testing helped analyze load effects and verify the design, with good

Author
Bravo Paytano Bryan
Language
EN