Overburden Soil and Drilling Costs by enrike zamora is a document available to read on EtoBox.
What is Overburden Soil and Drilling Costs about?
This document provides information on the equipment, costs, and specifications for a proposed mining and processing operation. It details the capital costs for the mine including $43.2 million for drilling, loading, hauling, maintenance and services equipment. It also outlines the $79 million in capital costs for the processing mill which covers crushing and grinding, processing, general infrastructure like water, power and buildings. The total capital cost for the entire project is estimated to be $122.2 m