About this document
Approval of Design for Mega Lift Projects by ramesh is a document available to read on EtoBox.
This document is a letter from the Project Director-cum-Chief Engineer of the PMU Mega Lift Projects approving the GA & GTP (General Arrangement and Guaranteed Technical Particulars) design booklet of Flow and Pressure Control Valves for 14 schemes under Cluster VII Mega Lift Projects. The letter requests the recipient to receive the approved copies of the design booklet and submit the approved vendor details along with a performance certificate for the valves within 3 days, providing both hard and soft cop
- Author
- ramesh
- Language
- EN