Opening book details…
Can I read BSC Modification P354 Draft Requirements on EtoBox?
BSC Modification P354 Draft Requirements by dhruv is a document available to read on EtoBox.
What is BSC Modification P354 Draft Requirements about?
This document outlines draft requirements for BSC Modification P354, which proposes providing ABSVD (Applicable Balancing Services Volume Data) at the MSID (Metering System Identifier) level rather than at the BM Unit level. The key requirements are: 1. National Grid would provide ABSVD at the MSID level rather than the BM Unit level. 2. Suppliers would submit ABSVD data and files for each MSID pair in a bulk and pre-agreed format within defined timelines. 3. National Grid would check submitted ABSVD d
- Author
- dhruv
- Language
- EN