Skip to content

Opening book details…

About this document

Snubco S-9 Tubular Removal Procedure by Dean Rein is a document available to read on EtoBox.

The document provides a procedure for tripping heavy pipe out of a wellbore using a Snubco Model S-9 while staging tubing connections to avoid exceeding recommended pressure limits. The procedure involves connecting the workover rig blocks to the tubing, lifting sections through the stripping annular while marking the drill line, lowering sections between the lower stripping rams and bleeding off pressure before continuing to remove the next tubular connection.

Author
Dean Rein
Language
EN