What is Unit Shutdown Activities Procedure about?
After shutting down the unit, there are several activities that must be completed in stage 1 of the shutdown process. Key activities include isolating electrical supply, draining lines, stopping vacuum, closing isolating valves on steam, water, and oil systems, and monitoring critical parameters such as fan operation, bearing speeds, oil levels, and pump operation. The document outlines 17 individual steps to complete the stage 1 shutdown safely in under 72 hours.