Can I read Non-Conformity Report on T-Girder Stressing on EtoBox?
Non-Conformity Report on T-Girder Stressing by ARIF ARIAN is a document available to read on EtoBox.
What is Non-Conformity Report on T-Girder Stressing about?
A Non-Conformity Report (NCR) was issued for the stressing of Precast T-Girder No.06, which was conducted prematurely at 4 days instead of the required 7 days after concrete casting. The contractor has proposed corrective actions and submitted supporting documentation to justify the early stressing based on achieving 90% of the concrete
- Author
- ARIF ARIAN
- Language
- EN