About this document
RA For HRSG Erection Works Rev1 by khuynhtran is a document available to read on EtoBox.
The document outlines a risk assessment for the HRSG erection work associated with the Nhon Trach 3 and 4 power plant project, detailing potential hazards, incidents, existing controls, and additional controls needed to mitigate risks. It categorizes risks by severity and frequency, highlighting tasks such as lifting heavy materials, working at heights, and operating cranes, with specific safety measures and training requirements. The assessment emphasizes the importance of supervision and adherence to safe
- Author
- khuynhtran
- Language
- EN