Skip to content

Opening book details…

About this document

Richmond Campus Phase 1b Demolition Plan by shane.ramirez1980 is a document available to read on EtoBox.

The document outlines the Phase 1b demolition plan for the Richmond Education and Enterprise Campus, detailing the demolition of several existing buildings over an estimated 14-week period. It includes safety measures for asbestos removal, dust and noise control, and the management of demolition waste, ensuring compliance with relevant regulations. Access to the site will be managed to minimize disruption to the local community, with specific working hours and environmental management practices in place.

Author
shane.ramirez1980
Language
EN