About this document
ERICO Dynasphere MKIV Mast Installation by Ruben Gutierrez is a document available to read on EtoBox.
This document provides installation instructions for an 8m aluminum cantilevered mast with a terminal elevation of 6m above the mounting structure. The mast installs by bolting a base flange to a concrete pad using four anchor bolts per detail A, then sliding telescoping sections together and securing them with bolts as shown in detail B to reach the desired height.
- Author
- Ruben Gutierrez
- Language
- EN