Can I read 018-Lrk-0102-El-Itp-103 - Fat Procedure Cable - Afc - App on EtoBox?
018-Lrk-0102-El-Itp-103 - Fat Procedure Cable - Afc - App by Feliandro Firmansyah is a document available to read on EtoBox.
What is 018-Lrk-0102-El-Itp-103 - Fat Procedure Cable - Afc - App about?
The document outlines the Factory Acceptance Test (FAT) Procedure for Electrical Cable at PT. Pertamina EP, detailing the inspection and testing processes to ensure compliance with design and safety standards. It includes a revision history, scope of work, responsibilities of key personnel, and a work sequence for the project upgrading the lighting system at the PPP & SPU Sei Karas Field. The document is approved for construction and serves as a manual guide for the inspection and function testing of electr
- Author
- Feliandro Firmansyah
- Language
- EN