Can I read CH 2+212TCS 3 on EtoBox?
CH 2+212TCS 3 by f5ftcpxff6 is a document available to read on EtoBox.
What is CH 2+212TCS 3 about?
The document outlines the construction details for the realignment of NH-1 to a two-lane specification under the BRO project Vijayak in Ladakh, with M/s SRM Contractors Pvt. Ltd. as the client and FBC Infratech Private Limited as the EPC contractor. It includes submission details for slab culverts and reinforcement drawings, with various consultants involved in the project. The drawings are dated June 2024 and include specific titles and scale information.
- Author
- f5ftcpxff6
- Language
- EN