About this document
SS22e Site Pre by dung.nguyentien8899 is a document available to read on EtoBox.
The NCR SelfServ™ 22e ATM Site Preparation document outlines the compliance requirements for the ATM with various EMC directives and the responsibilities of the customer in preparing the installation site. It emphasizes the importance of adhering to specifications to prevent equipment damage and ensure proper operation. The document serves as a guide for architects and site preparers, detailing installation requirements, dimensions, and customer obligations.
- Author
- dung.nguyentien8899
- Language
- EN