Daily Manpower Cost For 03 Nos Bogie Frames by rajit kumar is a document available to read on EtoBox.
The document outlines the manpower planning and cost analysis for the production of LHB bogie frames, detailing the various stages of work, labor rates, and total costs for the day. It specifies the number of workers required for each role and the total manpower needed for the production of three bogie frames. The total cost for the day is calculated to be 20,562.50, with a cost per bogie frame of 6,854.17.