Master BBU Main Equipment by Balaji Allupati is a document available to read on EtoBox.
The document outlines the Balance of Plant Package for the Gadarwara STPP Stage-II project, detailing the main equipment and their respective costs as provided by the LC Infra- Indure Consortium. It includes a comprehensive breakdown of various systems such as water treatment, cooling, and material handling, with a grand total estimated at ₹ 12,51,95,62,400. Additionally, it specifies that the quantities and descriptions are tentative and subject to revision upon completion of detailed engineering.