Dewatering Risk Assessment Guidelines by James Bonito is a document available to read on EtoBox.
This risk assessment identifies hazards associated with dewatering work for a 300MW coal power plant construction project. Hazards include slips/trips, improper lifting, heat stress, and fire. Controls to reduce risk include safety briefings, proper PPE, barricades, weather monitoring, first aid availability, and removing combustibles. With controls, most risks are reduced to level D or E on the risk matrix, indicating an acceptable level of risk.