Skip to content

Opening book details…

Can I read Economical evaluation of Alkhobar Phase two 50 MIGPD at three different mode of operations on EtoBox?

Economical evaluation of Alkhobar Phase two 50 MIGPD at three different mode of operations by N. Nada; D. Khumayyis; M. Al Hussain is a Environmental Science article available to read on EtoBox.

What is Economical evaluation of Alkhobar Phase two 50 MIGPD at three different mode of operations about?

Alkhobar Phase two located on Arabian Gulf in the Eastern Province of the Kingdom of Saudi Arabia. The Plant is designed to produce 50 MIGPD distillate and 750 MW gross power. The plant consists of five units, each unit consists of a boiler, turbine and two desalination lines. Each desalination line is designed to produce5 MIGPD (100%) at top brine temperature of 90°C with the use of polyphosphate as scale inhibitor. The desalination line is also designed to operate at two different higher top brine temperature with the use of high temperature additive. These two top temperatures are 106°C and I15°C production corresponding to these two brine temperatures are 6 MIGPD (120%) and 6.7 MIGPD (134%) respectively. T~is paper attempts to compare the performance of the desalination units at the base output of 90°C top temperature with the other twopossible modes of operation from economical point of view.

Who reads Economical evaluation of Alkhobar Phase two 50 MIGPD at three different mode of operations?

It is typically read by researchers, students, and practitioners in Environmental Science.

Author
N. Nada; D. Khumayyis; M. Al Hussain
Publisher
Elsevier Science; Elsevier ; Elsevier BV (ISSN 0011-9164)
Published
1985
Language
EN
Field
Environmental Science (Physical Sciences)

More by N. Nada; D. Khumayyis; M. Al Hussain

Browse all works by N. Nada; D. Khumayyis; M. Al Hussain