Can I read Mobilization and Demobilization Costs on EtoBox?

Mobilization and Demobilization Costs by Joebert Sencio is a document available to read on EtoBox.

What is Mobilization and Demobilization Costs about?

This document provides a detailed cost estimate for a water source development project including 3 parts: 1) Mobilization and demobilization for the project site totaling $140,000 2) Construction of a 1.50m x 1.50m x 150m collection box including excavation, concrete works, and installation of fittings totaling $127,126.65 3) Construction of a 3.0m x 3.0m x 2.50m concrete water tank. The estimated costs are broken down into materials, labor, direct costs, markup, and taxes for each item.