About this document
Fire Safety Site Visit Questions 2020 by Tan Soon Hee Alvin is a document available to read on EtoBox.
The document summarizes questions asked of QP fire safety regarding a site visit on 17 April 2020. Key requirements discussed include: - Implementing a sprinkler system would require erecting fire-rated walls and automated shutters. - The red triangle sign on windows cannot be removed and must be placed every 20 meters. - Water and electrical piping must be routed separately. - A fire alarm panel may need to be linked to SCDF for buildings over 5,000 square meters. - At least 3 meters of road space can b
- Author
- Tan Soon Hee Alvin
- Language
- EN