Opening book details…
Can I read Plumbing Cost Breakdown for Child Center on EtoBox?
Plumbing Cost Breakdown for Child Center by dasmindpcqbo is a document available to read on EtoBox.
What is Plumbing Cost Breakdown for Child Center about?
The document provides a summary of labor costs for plumbing works for a proposed 2-story child development center and multi-purpose center located in Caloocan City, Metro Manila. It includes 3 items - plumbing fixtures and equipment, sewer, vent and storm drainage lines, and water line distribution. Under each item are the materials, quantities, unit costs, and total costs for each plumbing component. The total labor and material cost is PHP 311,719.68 with a 12% contractor
- Author
- dasmindpcqbo
- Language
- EN