Skip to content

Opening book details…

About this document

Inspeksi MCB PT PLN Bali Selatan by AdiArtha13 is a document available to read on EtoBox.

The inspection report from PT PLN (PERSERO) dated February 28, 2025, details the inspection of 280 units of MCB (230/400V;1P;6A;50Hz) with no claims or waste reported. The inspection number is 55SLT2502280323, and all materials are categorized as standby with no operational materials. The report includes details of the inspection team members and their roles.

Author
AdiArtha13
Language
EN