Quality Control for Upper Cisokan Project by dana setiawan is a document available to read on EtoBox.
What is Quality Control for Upper Cisokan Project about?
This quality control table provides acceptance criteria and tolerances for metal works, water diversion and handling, and open air earthworks for the Upper Cisokan Pumped Storage Power Plant Project Package 1 Lot 1B. It lists over 20 metal works items and specifies they must meet approved shop drawings. For water diversion, it requires rainfall be handled for intensities up to 60 mm/hours. Regarding earthworks, it outlines excavation tolerances, material testing standards, compaction requirements, and blast