Skip to content

Opening book details…

About this document

Infrastructure Project Cost Breakdown by Theme Sakri is a document available to read on EtoBox.

The document outlines the costs associated with various construction items for M/S Keyuri Infrastructure in Dhule, including a compound wall, drain, box culvert, water supply line, electric line, and dismantling. The total tender cost is 24,492,333, while the awarded cost is 21,636,528, reflecting an 11.66% reduction. Each item is detailed with specific bill numbers and their corresponding costs.

Author
Theme Sakri
Language
EN