Inspection of Fixing Roof Tile at Plaza Top Roof by mohamed.isrcon is a document available to read on EtoBox.

The document outlines the inspection process for the MUROO4 AL ZAIN PROJECT, specifying that all inspection requests must be submitted to the supervision consultant by 14:00 the day before the planned inspection. It details the works to be inspected, including the fixing of ties at the plaza top roof, and includes references to relevant drawings and specifications. Additionally, it describes the necessary signatures and documentation required from both the subcontractor and the contractor for the inspection