Can I read 765/400kV Agra Substation Automation System on EtoBox?
765/400kV Agra Substation Automation System by Pandiyan is a document available to read on EtoBox.
What is 765/400kV Agra Substation Automation System about?
This document outlines the scope for a substation automation system (SAS) for the 765/400kV Agra Substation in Uttar Pradesh, India. Key details include: - The SAS will monitor and control 9 bays of 765kV equipment and 15 bays of 400kV equipment, with control building units for auxiliary systems. - Protection requirements include distance protection for 765kV and 400kV lines, and line differential protection for the 400kV Agra-Agra South line. - The SAS will integrate monitoring devices like gas analyz
- Author
- Pandiyan
- Language
- EN