Can I read Brickwork Measurement Analysis 1:6 on EtoBox?
Brickwork Measurement Analysis 1:6 by dhirajbista77 is a document available to read on EtoBox.
What is Brickwork Measurement Analysis 1:6 about?
The document provides a detailed breakdown analysis of brickwork in a cement mixture of 1:6, including quantities and costs for skilled and unskilled labor, materials like bricks, cement, and sand, as well as equipment costs. The total cost for the project is calculated to be Rs 222,161.707, including VAT. It is prepared by Prince Baniya, a Class 12 student with Roll No. 4.
- Author
- dhirajbista77
- Language
- EN